PVS Structures is excited to share that our work is featured on the March 2020 cover of AISC’s Modern Steel Construction magazine. The cover image shows a collaboration stair designed to encourage teamwork between the levels at HDR. The design, fabrication, and installation of the structural steel, including these stairs, was a result of the teamwork between HDR, Kiewit, TD2, Davis Erection, H&R and PVS. In all, PVS delivered 1700 tons of steel to build this 10-story building, the anchor of Aksarben Village that includes other PVS projects, including: Pacific Life and Right at Home.
Please use the link below to view the article.
https://lsc-pagepro.mydigitalpublication.com/publication/?m=7946&i=649593&p=24