Select Page
“Most Beautiful” Bridge Restored and Rededicated

“Most Beautiful” Bridge Restored and Rededicated

The refurbished Dodge Street Overpass in Omaha, Neb., celebrated its 50th anniversary with a rededication ceremony today. Danielle Kleinhans, PE, PhD, AISC’s vice president of bridges and managing director of NSBA, was in attendance to reaffirm the bridge’s “Most...
PVS – 900 Tons of Structural Steel

PVS – 900 Tons of Structural Steel

PVS is supplying approximately 900 tons of structural steel to the three story project for Methodist Health Systems Corporate Headquarters. The site is located on the northwest corner of 168th and Pacific. Stay tuned for more updates at the project...
In The AISC News….A New Director

In The AISC News….A New Director

The American Institute of Steel Construction (AISC) Board of Directors is pleased to announce the election of David Zalesne, president of Owen Steel Company, Inc., Columbia, S.C., as its new chair; Jack Klimp, vice president and general manager of Cianbro Fabrication...
PVS Nuclear Team

PVS Nuclear Team

PVS nuclear team celebrating the delivery of the last C8 trunk on October 17th.   Over 100,000 hours were devoted to the supply for both VC Summer and Vogtle nuclear islands.  The level of complexity and challenge was unrivaled, and welcomed by our team of problem...
More Slagger news……

More Slagger news……

Owen Industries is excited to be a partner with Kemper for European distribution and production of the Slagger table.  Shown at the Kemper booth during the Schweissen-Schneiden show in Dusseldorf, Germany is a small, single blade unit — many thanks to all of you...